OUR STORY

Tirupati 2017-2022

Our Regular is at Vikram Cement Work at khor, tehsil Jawad Distt. Neemuch (M.P.) for Shree Tirupati Engg . Work, have more than 100
workers in Regular Job. and more than 50 workers are in Supply job. Another regular site is at Ambuja Cement Ltd. Marwa Mudwa, Nagaur, Rajasthan for Shree Tirupati Engg. Works. Here we have also 50 workers are in regular job. Our GSS Regular Site at Aditya Cement and Aligarh Here we have 50
workers in regular job.

Our G.S.S. Engg. do shut down as listed below

Ultra Tech Cement Ltd.

UTCL at Aligarh

  • we do shut down job for fabrication and erection of hopper and Loco,Unlodding.
UTCL at Jharuguda, Odissa
  • we do replacement of chain bucket and segementof elevator.
UTCL at kotputali,Jaipur
here we do many shut down Jobs like.
  • RABH fan impeller & ducting replacement work.
  • Bearing and geared coupling replacement work.
  • Loesche Mill Rocker arm bearing replacement work.
UTCL Dadri U.P.
  • we have done bucket elevator replacement job, ball mill shell liner replacement work, Roller press,Roller replacement job.
UTCL Hirmi at baloda bazar Raipur chattisgarh
  • we do calciner Fan replacement work. And also we have done Magg. G.B. hauling and Separator Rotor Replacement.
UTCL Dalla
  • mill shell liner replacement & EOT Ra Replacement and Shell crack repairing, bucket elevator, chain, casing, spocket replacementwor.
UTCL Bageri (HP)
  • we have replace roller of roll press.
UTCL Batinda Punjab
  • we have replace ball mill slide shoe bearing Replacement Job.
UTCL Sikandrabad (U.P.)
  • we have do Roller press and seperator grit cone Replacement.
UTCL Jhajjar(Hariyana)
  • Replacement Polysis roller of roller press.
  • Ball Mill Shell Liner and dipharm replacement work.
UTCL Aditya Cement work (Rajasthan)
  • we have regular site and have 50 man power is still working and we also do shutdown.

UTCL Tanda U.P

UTCL Tanda U.P

  • we havedone replacement of OK F.L.S. Mill Body with Classifier, G.B., Rotor & It’s ducting replacementand modification.

UTCL at Panipat, Hariyana

  • we do shut down for KHD polycom roller replacement Job and S.K.S. rotor replacement Job.

SHREE TIRUPATI ENGG. WORKS

ULTRATECH CEMENT LIMITED
UTCL Vikram Cement Works

  • Preheater maintains Job.
  • Impellerfan replacement and casing modification work.
  • AFR shreddegrabber assembly and erectionwork.
  • Coal mill coal do sing system modification work.
  • Kiln maintains Jobs.
  • Cooler maintains Jobs.
  • Ball mill head replacement work..
  • New Pefister with coal lineerection and commissiong work.
  • Grabber System and its panconveyor erection and commissiong work.

UTCL Sewagram Gujrat

  • Kiln maintenance work.
  • E.S.P. maintenance work.

UTCL Roorkee Uttrakhand

  • Sepax separatorrotorwith cone replacement.

UTCL BAGA (H.P.)

  • Gebr Pfeifferraw mill tyre, and its table liner replacement work.
  • Loesche cement mill tyre, table liner and its roller replacement job.

AMBUJA CEMENT LTD

UNITE – Marwa Mundwa (Rajasthan) –

  • A. Replacement and Overhauling of flender Gear Box at Raw Mill.
  • here we do gear box of cement mill and raw mill ,kiln bucket elevator and rocker arm and granding Overhauling and bearing replacement job.
UNITE – Sankrail (Howrah)
  • At Howrah we do roller press roller replacement job.

RCCPL Private Limited (MP Birla Goup)

UNITE – Kundanganj, Reaebareilly (U.P.) –

  • Here we have Replace Roker Arm bearing replacemnt work of Loesche Mill.

ACC CEMENT LIMITED

UNITE – ACC wadi Cement work –
Highest Clinker capacity of the world in this plant.

  • Replacement of Gean Box.
  • Pre heater Belt Bucket elevator Belt Replacement Work.

MY HOME INDUSTRIES PRIVATE LTD

UNITE – Vizag Grinding Unit (Vishakhapatnam)

  • Replacement of Gear Box of Loesche Mill.
  • Replacement of Grite cone.

JOJOBERA CEMENT PLANT

  • Replacement of cement shel mill liner.
  • Separator upper and bottom seal replacement.
  • Mill outlet trunion bearing replacement.
  • Losche 53.3 we have do replacement of roller seal, grite cone and table liner work.

NUVOCO VISTAS CORPORATION LIMITED

SONADHI CEMENT PLANT

  • Both Kiln maintains job, Tyre shimming, guide block replacement and tyre alignment work.
  • P.H. Down, Ductexpansion joint replacement at 85 Meter Height.
  • Loesche raw mill tyre, table liner, erection of classifier and its outlet duct.
  • Dip Tube replacement work.

CHITTORGARH CEMENT PLANT

  • Coal reclaimer chain bucket replacement job.
  • Sinoma roller press, roller replacement job and its assembly work.
  • Loesche coal mill tyre and roller replacement job.
  • Dip tube of 4A and 4B.

NIMBOL CEMENT PLANT

1. Gebr pfeiffer mill roller and table liner Replacement work.

ARASMETA CEMENT PLANT

1. We have do Dip tube and 06 Nos Bag fillter erection work on silo top.

J.K. CEMENT NIBAHERA CHITTORGARH

  • Reclaimer chain replacement work.
  • Kiln tyre shimming work.

GEO SERVEX HUB INDIA PVT. LIMITED

  • Replacement of New Bucket Elevator from Beumer to Aumund.

PROJECT

UTCL – Aligarh Cement Plant

  • Here we have Fabrication, Erection and Commimissioning of 1000MT WPC Steel Silo.
UTCL – Panipat Cement Plant
  • In Panipat Cement Plant we do Fabrication, Erection and Commimissioning of 1000MT WPC Steel Silo.
UTCL – Nagpur Cement Plant
  • We have also done our Project for Fabrication, Erection and Commimissioning of 1000MT WRC Steel Silo.
JK CEMENT BALASINOR
  • Here we do project like fly ash silo all structure, equipment erectionand commissing work.
  • As also do cement silo and steel silo all structure pipe line, air slide erection and commissiong work.

Message Us on WhatsApp